Penerapan Metode Value Stream Mapping dan 5S untuk Meningkatkan Cycle Time Proses Produksi Sepatu pada UD. XYZ

Authors

  • Fiky Two Nando Universitas 17 Agustus 1945 Surabaya Author
  • Latisha Aura Ilmanzani Universitas 17 Agustus 1945 Surabaya Author
  • Fitrah Yunanda Universitas 17 Agustus 1945 Surabaya Author
  • Shinta Naafia Permatasari Universitas 17 Agustus 1945 Surabaya Author
  • Muhammad Nabil Izulhaq Universitas 17 Agustus 1945 Surabaya Author
  • Febrianto Taruk Bua Universitas 17 Agustus 1945 Surabaya Author

DOI:

https://doi.org/10.63142/ijeti.v1i3.383

Keywords:

Value Stream Mapping, Process Activity Mapping, 5S, Cycle Time

Abstract

UD. XYZ is one of the trading businesses that produces shoes with a simple working system. The production process is still dominated by activities that take a considerable amount of time due to the lack of standardized work and the high number of activities that do not directly add value to the product. This condition causes the total production time to be long and work efficiency to decrease. Therefore, this research aims to reduce cycle time and improve the efficiency of the shoe production process by identifying waste and applying Value Stream Mapping (VSM), Process Activity Mapping (PAM) methods, and implementing the 5S principles for improvement efforts. Based on the analysis results of the Current State Map and PAM, the total production time is 5,760 seconds, with most of it being necessary non-value added (NNVA) activities. After implementing improvement efforts using the 5S principles, the process and picking times, which previously took a long duration, were successfully reduced, resulting in a decrease in cycle time to 5,030 seconds, or an efficiency improvement of 12.6%. This result was achieved by adding supporting tools and machines and implementing improvements to the work system at UD. XYZ. Thus, the combination of the VSM method and the 5S principles proved effective as an improvement strategy for optimizing production performance.

Author Biographies

  • Fiky Two Nando, Universitas 17 Agustus 1945 Surabaya

    Universitas 17 Agustus 1945 Surabaya

  • Latisha Aura Ilmanzani, Universitas 17 Agustus 1945 Surabaya

    Universitas 17 Agustus 1945 Surabaya

  • Fitrah Yunanda, Universitas 17 Agustus 1945 Surabaya

    Universitas 17 Agustus 1945 Surabaya

  • Shinta Naafia Permatasari, Universitas 17 Agustus 1945 Surabaya

    Universitas 17 Agustus 1945 Surabaya

  • Muhammad Nabil Izulhaq, Universitas 17 Agustus 1945 Surabaya

    Universitas 17 Agustus 1945 Surabaya

  • Febrianto Taruk Bua, Universitas 17 Agustus 1945 Surabaya

    Universitas 17 Agustus 1945 Surabaya

References

Adjietama, M. N., & Rahmawati, N. (2025). Penerapan Konsep Lean Warehousing untuk Minimasi Pemborosan Gudang Suku Cadang dengan Metode VSM Pada PT ABC.

Ansyah, E., Kustiwan, S., & Supriyati, S. (2025). Analisis Lean Manufacturing untuk Mengurangi Cycle Time dengan Menggunakan Metode Value Stream Mapping. Jurnal Penelitian Inovatif, 5(3), 2153–2162. https://doi.org/10.54082/jupin.1693

Fadilah, M., & Wibero, R. (2024). Rancangan Lean Manufacturing untuk Mengurangi Pemborosan pada Proses Pembuatan Sepatu dengan Pendekatan Metode Value Stream Mapping (Vsm) dan Root Cause Analysis (Rca) di Home Industry Sepatu. Jurnal Greenation Ilmu Teknik, 2(1).

Hizkia, S. H., & Wibero, R. (2023). Perbaikan Waktu Proses Ikm Sepatu di Daerah Tangerang dengan Pendekatan Lean Manufacturing. Jurnal Greenation Ilmu Teknik, 1(2), 93–108. https://doi.org/10.38035/jgit.v1i2.115

Juwita, A. D., & Annisa Islami, M. C. P. (2025). ANALISIS PENERAPAN LEAN MANUFACTURING DAN 5S DI PT ATLANTIC ANUGRAH METALINDO MENGGUNAKAN METODE VSM. Teknika STTKD: Jurnal Teknik, Elektronik, Engine, 11(1), 29–40. https://doi.org/10.56521/teknika.v11i1.1313

Moengin, P., & Ayunda, N. (2021). Lean Manufacturing untuk Meminimasi Lead Time dan Waste agar Tercapainya Target Produksi (Studi kasus: PT. Rollflex Manufacturing Indonesia). JURNAL TEKNIK INDUSTRI, 11(1), 77–92. https://doi.org/10.25105/jti.v11i1.9699

Pramono, K., & Putih, M. (2023). Pengaruh Motivasi, Budaya Kerja 5s, Dan Disiplin Kerja, Terhadap Kinerja Karyawan. 276–285.

Putro, M. S. A., & Nursyamsiah, S. (2024). ANALISIS IMPLEMENTASI LEAN MANUFACTURING DENGAN METODE 5S PADA STARTUP MANUFAKTUR DI INDONESIA. Jurnal Ilmiah Manajemen, Ekonomi, & Akuntansi (MEA), 8(3), 1800–1817. https://doi.org/10.31955/mea.v8i3.4652

Sumasto, F., Saputri, S. H., Awani, R. S., Maulana, A., Simanjuntak, K., Ismono, A., & Supardi, S. (2023). Penerapan Prinsip 5S untuk Mengurangi Waste Motion dalam Proses Layanan Galon R-Water. Jurnal Serambi Engineering, 9(1), 7788–7794. https://doi.org/10.32672/jse.v9i1.742

Suwandi, N. N., & Suhada, K. (2025). Penerapan Lean Manufacturing dengan Metode Value Stream Mapping untuk Mengurangi Cycle Time pada Bagian Perakitan Spring Mattress di PT X. Journal of Integrated System, 7(2), 111–133. https://doi.org/10.28932/jis.v7i2.8694

Yulyani, E., Widyadhana, K. A., Moulydhea, R. I., & Sari, R. (2025). PENERAPAN LEAN MANUFACTURING DALAM MENGURANGI LEAD TIME DAN MENINGKATKAN EFISIENSI. Integrative Perspectives of Social and Science Journal, 2(2 April), 2282–2296. https://ipssj.com/index.php/ojs/article/view/317

Zulfikar, A. M., & Rachman, T. (2020). PENERAPAN VALUE STREAM MAPPING DAN PROCESS ACTIVITY MAPPING UNTUK IDENTIFIKASI DAN MINIMASI 7 WASTE PADA PROSES PRODUKSI SEPATU X DI PT.PAI. INOVISI, 16(01). https://ejurnal.esaunggul.ac.id/index.php/inovisi/article/view/4046

Downloads

Published

2025-10-16

How to Cite

Nando, Fiky Two, Latisha Aura Ilmanzani, Fitrah Yunanda, Shinta Naafia Permatasari, Muhammad Nabil Izulhaq, and Febrianto Taruk Bua. 2025. “Penerapan Metode Value Stream Mapping Dan 5S Untuk Meningkatkan Cycle Time Proses Produksi Sepatu Pada UD. XYZ”. Indonesian Journal of Engineering and Technological Innovation 1 (3): 88-99. https://doi.org/10.63142/ijeti.v1i3.383.